Applicable models: CL4NX/6NX
Set whether to prioritize the settings that are done through the product or through commands for the module selection setting.
The options are as follows:
Prioritize the settings through commands.
Prioritize the settings that are done through the product.
|
|
|
•
|
Even if you select [Commands], the settings that are done through the product are used if no command is sent.
|
|
[03-02475-EN]